+297 588-9377 | +297 733-8969 admin@coburgaruba.com

Embassy Suites by Hilton Aruba Resort

Construction work in different areas such as:

  • 15.000m2 in metal stud structure for cover in dens glass for façade.
  • 23.000m2 in interior sheetrock walls.
  • 13.000m2 in over floor.
  • 12.500m2 in sheetrock ceiling.
  • 15.000m2 in façade in Sothern system.
  • 46.000m2 in paint work.
  • 22.000 yards in leveling and compaction granite.
  • 1.800m3 in concrete for retain walls and others.