Embassy Suites by Hilton Aruba Resort
Construction work in different areas such as:
- 15.000m2 in metal stud structure for cover in dens glass for façade.
- 23.000m2 in interior sheetrock walls.
- 13.000m2 in over floor.
- 12.500m2 in sheetrock ceiling.
- 15.000m2 in façade in Sothern system.
- 46.000m2 in paint work.
- 22.000 yards in leveling and compaction granite.
- 1.800m3 in concrete for retain walls and others.